Operations & Engineering
Rig Report
Rig timeline, down wells, equipment location and roustabout work, with daily rig reports.
Engineer Dashboard
Company- and field-level daily production, broken out by responsible engineer.
Operations Dashboard
Company- and field-level daily production, on the operations side.
Workover Rig Training
Safety training modules for workover rig crews, in English and Spanish.
Asset Dashboards
Dimmit
Well status, lift type, LP/TP/CP pressures and gauger remarks across the Dimmit asset.
BRG Assets
Well status across 307 BRG wells, with MTD oil and gas sales and open-valve tracking.
BRG Revenue & LOE
Month-level production, revenue and LOE review with materiality thresholds and follow-ups.
Wickett
Ward Estes North GWO CO₂ flood — pattern map, drop analysis and completion connectivity.
Pena Creek
Well map across PCU, SPCU and EPCU — production, injection and IWR trend.
CO₂ Assets
GLSAU Field Operations
Oil, water and gas trend against LACT sales, down wells by cause, workover and LOE spend, chemical cost per BOPD, and payroll.
GLSAU Reservoir Surveillance
Pattern map with IWR labels and satellite outlines — select wells to compare producer and injector performance, decline watch and recent inactives.
Katz Field Operations
Water and CO₂ balance, injection target vs actual with meter-gap flags, the WAG injector mix and switch history, down wells, LOE and workover cost by well.
Katz Reservoir Surveillance
Pattern map back to 2010 — producer and injector performance, pattern production, decline watch and satellite comparison.
Company-Wide
Daily Production
Company- and lease-level daily production across all Atlas operations.
Oil Sales
Oil and gas production against sales, by operator and by field. Aug 2025 – Jul 2026.
Non-Operated Assets
AOBO, BOBO and Remora — revenue, JIB/LOE and net income by operator.
Dispatch
Field Data Entry
Flowback Entry
Field entry form for flowback reports.
Dimmit Well Entry
Daily entry covering every well on the Dimmit asset.
Joshua Smith Route
Well entry for the wells on Joshua Smith's gauger route.
Kaleb Mobley Route
Well entry for the wells on Kaleb Mobley's gauger route.
Pena Creek
Well entry for the Pena Creek units — PCU, SPCU and EPCU.
Workforce
Task Tracker
Assign and track work across the team. Opens as Atlas Work — each person signs up once with their email, then signs in with a password.
Quitman Timesheet
Crew time entry for the Quitman field.
Quitman Timesheet — Approvals
Review and approve submitted Quitman timesheets.
Tools
Atlas Approvals
Payment approvals and tracking.
Wellbore Designer
Build vertical wellbore diagrams — casing and liner strings, tubing and rod assemblies, perforations, plugs and GAU zones — with wellbore capacity and plugging cement volumes calculated as you go. Exports JSON or prints to PDF.